
Training for Lineworkers who perform ‘live-line’ work needs to be both comprehensive and current. This new, 180 page Training Manual from ISPC uses the latest industry best practices, tools and equipment to explain and illustrate how to safely work on most energized systems. OSHA regulations pertaining to energized work are highlighted and explained in the language of the working lineman. Includes a 50 questions knowledge test and 3 Field Performance Requirements skill checklists.
Table of Contents
1: Introduction
Performance Objectives
2: The Electric Distribution System
Overhead System Features Underground System Features
3: Safety Hazards for Lineworkers
Federal OSHA Regulations
Contacting Energized Lines and Equipment Electric Arcs and Flash-overs
4: Theory of Insulate and Isolate
Electrical Theory Review
Insulation and Isolation Techniques & Best Practices
• Minimum Approach Distance and Working Position
• Personal Protective Equipment (PPE)
• Insulating Protective Equipment (IPE)
• Bucket Trucks and Diggers
• Live-line Tools
5: Working on Energized Lines and Equipment
Overhead Distribution
• Skills to determine Live Parts
• Nominal Voltage of Lines
• Testing for Potential and Load
• Cover Techniques and Best Practices
• The Role of the Qualified Observer
Underground Distribution
• Inspecting a Cable Pole and Pad Mounted Transformer
• Testing for Potential and Load
• Cover Techniques and Best Practices